Since the tile adhesive cannot be pasted directly on the painting block, there may be a problem tiling on the painting block.Removing paint is a long and tedious process, but by creating an intermediate surface between the paint block and the tile, you can solve the adhesion problem without the need to remove the paint.The intermediate skim coating of this mortar covers the sheet metal strip nailed to the surface of the block.
This Batten holds the mortar to the paint block, allowing you to mount the tiles to the surface of the mortar rather than to the block.Clean the surface of any dirt or debris with pH-Neutral cleaner and sponge or scrub brush.Rinse the facial cleanser with clear water and then let the walls dry.
Nail 3.
4 extend the expanded sheet metal strip to the block with a concrete nail of 1/2 to 2 inch.Hammer the nail through the Batten into the block every 6 inch, overlapping the Batten 6-at the joint-Inches or 2 at vertical seams-Inch at the horizontal seam.Cut the batten with tin if necessary, and bend the Batten into corners, extending the Batten 6-Before cutting and overlapping the new part on the extended part beginning at the edge of the corner, inches on the adjacent wall.
Use an electric drill with an paddle attachment to mix a batch of thin mortar in the bucket.Add water to the mortar when stirring until the consistency of peanut butter.Use the platform of the notch spatula to lay the mortar on the wall and push the mortar through the Batten to the paint block.
Completely cover the batten with mortar, creating a new surface for the tile.Let the mortar dry overnight.Mix the second batch of flakes and take the material to 3-foot by 3-Square section of Foor.Turn the notch spatula to 45-Degree angle, then use the cut through the thin setting to lift the ridge in the extended thin setting.
From 1/8, set the tile to a ridge sheetStart inches from the bottom of the surface of the tile and use the tile spacer between adjacent tiles to keep the row evenly spaced.Fix the tiles in place using a slight twist movement.Spread thin with tiles, then place plywood on the tiles, then press the boards on the surface of the tiles to level the tiles.
Check the level with the Carpenter's level and adjust the tile height by pushing the tile further into the thin sleeve if necessary, or pull the tile freely and add additional thinset to the bottom of the tile to increase the height.Move to the lower part of the wall and apply additional thin settings before placing more tiles.Continue to place tiles by section until the required area is covered.
Make sure the tile height in the shower is high enough to be higher than the amount of water sprayed on the shower head.Let the mortar dry overnight.Remove the tile spacing device and use the grouting float to disperse the grouting into the seam between the tiles.Fill the 1/8-Inch space at the bottom of the tile, as well as seams on the edge of the tile space, where the space fills the wall with silicone to prevent water from leaking from below the edge of the tile.
Wipe any excess mud from the surface of the tile with a damp sponge.Wait two hours and wipe the tile again with cotton woolClear free cloth for any remaining grouting.Allow the mud to dry 72 hours before using the shower.